Figure 13: Inserting The Sfp - Allied Telesis AT-GS950/8 Installation Manual

Gigabit ethernet smart switch
Hide thumbs Also See for AT-GS950/8:
Table of Contents

Advertisement

Chapter 2: Installation
38
4. Slide the transceiver into the SFP slot until it clicks into place. See
Figure 13
5. Verify that the handle on the transceiver is in the upright position, as
shown in Figure 14. This secures the transceiver and prevents it from
being dislodged from the slot.
SFP Transceiver
Handle
Figure 14. SFP Handle in Upright Position
6. Repeat steps 2 through 5 to install additional SFP transceivers.
Note
SFP transceivers are dust sensitive. Always keep the plug in the
optical bores when a fiber optic cable is not installed, or when
storing the SFP. When you do remove the plug, keep it for future
use.
Note
Unnecessary removal and insertion of an SFP can lead to
premature failure.
Figure 13. Inserting the SFP

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs950/24At-gs950/48At-gs950/16

Table of Contents