Power Supply - Allied Telesis AT-GS950/8 Installation Manual

Gigabit ethernet smart switch
Hide thumbs Also See for AT-GS950/8:
Table of Contents

Advertisement

Chapter 1: Overview

Power Supply

22
Reboot the switch - By pressing the button for 5 to 9
seconds, you can initiate a software reboot of the
switch. All configuration settings including the
Management static IP address or DHCP are retained.
Caution
During the reboot process, the switch does not forward network
traffic. Rebooting the switch takes approximately 1 to 2 minutes
before the switch comes back on line and is ready to switch Ethernet
traffic again. Network traffic is lost during this period of time.
Factory default reset - By pressing the button for
greater than 10 seconds, you will initiate a software
reboot of the switch and reset all of the configuration
parameters of the switch to the factory default settings
- including the management IP address.
Note
When the switch is reset to factory defaults, its IP address will revert
to the static IP address of 192.168.1.1. If your browser is configured
for another IP address, you will have to reconfigure your browser
and workstation for the switch's default IP address before you can
again connect to the switch.
Both the reboot and factory default reset functions can
be disabled in the management software. For more
information, refer to the AT-GS950/8, AT-GS950/16, or
AT-GS950/24 Management Software User's Guide.
Each switch has an internal power supply with a single AC power supply
socket on the back panel. To power the switch on or off, connect or
disconnect the power cord provided with the switch. A power cord is
supplied with the switch from the factory.
Note
For the power requirements, refer to the "Power Specifications" on
page 49.

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs950/24At-gs950/48At-gs950/16

Table of Contents