Installation
•
Install the compressor in the reverse order of removing of compressor.
NOTE:
After installation, fully open the valve at bottom side of the compressor, using a hexagonal wrench.
Vacuuming
•
Connect the vacuum pump to the check joint of the discharge and suction pipes, and operate the vacuum pump.
•
Perform vacuuming until the vacuum low pressure gauge indicates 0.750 (mmHg).
Charging of refrigerant
Add refrigerant of the same volume to the recovered refrigerant into the check joint of the liquid pipe.
19
Replacing the compressor
Compressor replacement procedure
154