Refrigeration Cycle Diagram - Toshiba RAS-13SKHP-E Service Manual

Split wall type air conditioner
Table of Contents

Advertisement

Cooling
0.39 m
Heating
(Connecting pipe)
Æ12.7
O.D.:12.7 mm
P
Packed valve
(Æ12.7)
Heating
Cooling
4-way valve
Heating Cooling Compressor
Cooling
Heating
50Hz
Standard
Heating
Overload*1
Low temperature
Standard
Cooling
Overload
Low temperature
Note
·
Measure the heat exchanger temperature at the center of U-bend. (By means of TC sensor)
·
*1
During heating overload operation, a value for the high temperature limit control operation is included.

5. REFRIGERATION CYCLE DIAGRAM

Indoor unit
Heat exchanger
Cross flow fan
2K22S225CUA
Accumulator
Heat exchanger
Propeller fan
Outdoor unit
Standard
pressure P
exchanger interchanging
(MPaG)
1.74
2.33
1.35
0.48
0.58
0.45
T1
Capillary tube
Æ1.5 x 700
l
Refrigerant
R22 : 1.00 kg.
Mark (
) means check points of Gas Leak.
Surface temp. of heat
pipe T1 (°C)
44.1
57.0
33.4
10.3
14.8
2.0
- 9 -
FILE NO. SVM-07033
0.49 m
(Connecting pipe)
Æ6.35
O.D.:6.35 mm
Packed valve
(Æ6.35)
Capillary tube
Æ1.0 x 600
l
Ambient temp.
conditions DB/WB
Fan speed
(°C)
(indoor)
Indoor
Outdoor
High
20/15
Low
27/-
-
-10/-10
High
20/
High
27/19
High
32/23
Low
21/15
7/6
24/18
35/24
43/26
21/15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ras-13s2ah-e

Table of Contents