Body Solid G9U Owner's Manual page 34

Home gym
Table of Contents

Advertisement

S T E P
12
Be careful to assemble all components
in the sequence they are presented.
Most of the main frame parts in this step will have BLUE dots.
A.
Attach Leg Press Support (BA) to Main Base Frame (A) using:
Two 73 (3/8"x 2 3/4" hex head bolt)
Four 94 (3/8" washer)
Two 91 (3/8" nylon lock nut)
B.
Attach Leg Press Main Frame (BB) to Leg Press Support (BA) using:
Four 73 (3/8"x 2 3/4" hex head bolt)
Eight 94 (3/8" washer)
Four 91 (3/8" nylon lock nut)
C.
Attach Leg Press Main Frame (BB) to Side Base Frame (B) using:
Two 73 (3/8"x 2 3/4" hex head bolt)
Four 94 (3/8" washer)
Two 91 (3/8" nylon lock nut)
D.
Attach End Cap (15) to the top of Leg Press Main Frame (BB).
Attach two Frame Levelers (25) to the bottom of Leg Press Main Frame (BB).
Attach Pulley (26) to Leg Press Main Frame (BB) using:
One 76 (3/8"x 1 3/4" hex head bolt)
Two 94 (3/8" washer)
One 91 (3/8" nylon lock nut)
E.
Attach two Foot Caps (20) to each end of the Leg Press Front (BC).
Attach Leg Press Front (BC) to the front of Leg Press Main Frame (BB) using:
Two 65 (1/2"x 3" hex head bolt)
Four 93 (1/2" washer)
Two 90 (1/2" nylon lock nut)
Note:
You should now wrench tighten all bolts and nuts in this step.
Do NOT re-tighten any of the pad bolts or pulley bolts.
mm
Inch
32

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents