GE GEH50DEED Technical Service Manual page 40

Hybrid water heater
Table of Contents

Advertisement

To remove the front shroud:
Note: The front shroud is attached to the top of the
tank with 5 screws and to the rear shroud with 4
tabs (2 on each side) that engage 4 slots located
inside the machine compartment.
1. remove the front shroud cover. (See To remove
the front shroud cover, this section.)
2. remove the control panel from the front shroud.
(See
Control Panel, steps 1 thru 4
3. Remove the five T-20 Torx screws from the
bottom of the front shroud.
4. Lift the front shroud straight up to disengage the
4 tabs from slots in the rear shroud.
5. pull the front shroud out from the machine
compartment, then carefully tilt and pass the
control panel thru the opening.
To remove the rear shroud cover:
1. remove the front shroud cover. (See To remove
2. Disconnect power to the water heater.
3. remove the four T-20 Torx screws from the top
4. Lift the junction box cover from the rear shroud
.)
5. Disconnect the power supply wires at the water
Caution: Wiring is attached to the bottom of the
junction box. To prevent wire breakage, care must
be taken when removing the junction box from the
rear shroud cover.
6. Lift and disengage the junction box from the
– 40 –
the front shroud cover, this section.)
of the junction box cover.
cover.
heater junction box.
Rear Shroud Cover
Junction Box Cover
opening in the rear shroud cover.
Junction Box
(Continued Next page)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents