Dimensions And Fixings - Potterton Gold H Range Installation & Service Instructions Manual

Gold h range condensing boiler
Table of Contents

Advertisement

At Least 1.5°
D
Fig. 7
X
Fig. 8
© Baxi Heating UK Ltd 2012
E
A
B
360° Orientation
C
Tube Ø 110mm
F
Y

5.0 Dimensions and Fixings

The 1.5° fall provided by the elbow
is to allow condensate to run back to
the boiler, for disposal through the
condensate discharge pipe.
SIDE FLUE (left and right)
For every 1m of horizontal flue
length, the clearance above the top
At Least 1.5°
of the flue elbow should be 27.5mm
to incorporate the 1.5° fall in the flue
from the terminal to the elbow.
Flue length (Y)
DIMENSIONS
A 600mm
B 280mm
C 390mm
D 150mm Ø Min.
E 162.5mm
F 96mm
Clearance (X)
up to 1m
27.5mm
1m - 2m
55mm
2m - 3m
82.5mm
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents