Lower Door Panel
Fig. 23
32
© Baxi Heating UK Ltd 2012
Fig. 22a
Internal Polystyrene
Packaging Piece
Outercase
Break Off Upper &
Lower Pipe Run
Options
10.0 Installation
10.2
Preparing The Boiler
1. Remove the outer carton and packaging.
2. Lift the outercase upwards and remove.
3. Remove the internal packaging.