Installation
Installation Hints
Recommended Optional Equipment Installation Order:
-- GreenSmart Remote
-- Blower
-- LP Conversion and other optional equipment
Install the logs last - they are fragile.
When determining the location of the stove, locate the wall studs (for horizontal penetrations) and ceiling
trusses (for vertical penetrations). You may wish to adjust the stove position slightly to ensure the vent
does not intersect with a framing member.
Fumes and smoke from the paint curing and oil burning off the steel may occur the first time you start this
heater. This is normal. We recommend you open windows to vent the room.
Stove Clearances
NOTE: If using the rear vent configuration, you will require approximately
8-1/2" to the rear of the stove for the vent adapter and thimble. See page
18 for details.
Mobile Home Requirements
•
When the stove is installed in a mobile home, it must be bolted to the floor and the appliance grounded
(use the optional blower with a grounded circuit or other suitable grounding method - current ANSI/NFPA
70 or CSA C22.1).
© Travis Industries
(for qualified installers only)
4121120
9
100-01315