Figure 21 - Odu Mounted On Pole - Motorola PTP 500 Series User Manual

Motorola ptp 500 series point-to-point wireless bridges
Hide thumbs Also See for PTP 500 Series:
Table of Contents

Advertisement

3. Adjust the elevation and azimuth of the unit before tightening to the required torque
settings of 14 Nm (11 lb ft) for both bolts.
CAUTION
Attach the free end of the earth bonding lead (large tag M10) to the tower metal work.
On no account must this be attached to the mounting bracket bolts.
The enclosure and mounting brackets of the PTP 500 Series Bridge product range are
capable of withstanding wind speeds up to 200 mph (320 kph). The installer should ensure
that the structure the bridge is fixed to is also capable of withstanding the prevalent wind
speeds and loads. See Section 4.7 "Wind Loading".

Figure 21 - ODU Mounted on Pole

51
6 Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ptp 54500Ptp 58500Ptp 300 series

Table of Contents