Hiniker 700 Operator's Manual page 19

Pickup truck snowplow
Table of Contents

Advertisement

Connect the RH headlamp to the wiring har-
ness end labeled "PSNGR SIDE" and the LH
headlamp to the end labeled "DRIVER SIDE".
Ensure connections are fully mated for proper
sealing. There should be no gaps between
connector halves. Secure these cables to the
frame with plastic ties.
NOTE: Install the plow harness so that water does
not run down the wires and pool inside the "Y" con-
nection. Position the harness so that any trapped
water can easily drain away.
WARNING: Disconnect truck battery be-
fore beginning electrical installation to
avoid shock hazard.
8.
The motor solenoid, underhood wiring har-
ness, power cable and joystick control box
are located in the parts box shipped with the
snowplow frame.
Truck Battery On Passenger Side
NOTE: To prevent corrosion lightly coat all elec-
trical connections, ring and spade terminals with
dielectric grease prior to assembly.
Refer to drawing 6477. Lay the harness in
it's approximate position for final assembly
with the 7-pin circular connector near the
drivers side firewall, the 10-pin connector
just left of center near the grill, the relays
near the drivers side inner fender and the
5-pin headlight connectors at the respective
headlights.
9.
Determine the location of the vehicle bat-
tery. If the battery is located on the right
(passenger) side or if there are two batter-
ies configured as a 12 volt system then pro-
ceed to step 10. If the battery is located on
the left side of the vehicle then the wiring
harness will need to be modified.
Plow Assembly 17
DWG NO. 6477A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

750

Table of Contents