Bring-Up Sequence (And Stop) Times - IBM C1B 1.12 Brick On Sled Carrier 128-pin HPC Specification Sheet

1.12/2.25 gb - 1.0" high 4.51 gb - 1.6" high 3.5 form factor disk drive version 5.0
Table of Contents

Advertisement

O E M FUNCTIONAL SPECIFICATION ULTRASTAR XP (DFHC) SSA MODELS 1.12/2.25 GB - 1.0" H I G H

2.2.8 Bring-up Sequence (and Stop) Times

Figure 10. Start Time Diagram
Note: BATS is the abbreviation for Basic Assurance Tests. Start-up sequence spins up the spindle motor,
initializes the servo subsystem, up-loads code, performs BATS2 (verifies read/write hardware), resumes
"Reassign in Progress" operations, and more. For more information on the start-up sequence, refer to the
Ultrastar XP (DFHC) S S A Models Interface Specification.
Note: If a RESET is issued before the drive comes ready, the power on sequence will start again. In all
other cases when a RESET is issued the present state of the motor is not altered.
Note: Reference "Start/Stop Unit Time" on page 49 for additional details.
Note: See 5.7, "Spindle Synchronization" on page 69 for details about Start-up time increases when the
device is requested via Mode Parameters to synchronize the spindle motor to another device.
Event
Power-up
Start-up
Spin-up
Spindle Stop
Table 3. Bring-up Sequence Times and Stop Time for C1x Models
Page 36 of 87
USER RESPONSIBLE F O R VERIFYING VERSION A N D COMPLETENESS
Nominal
Maximum
1.5 sec
2.0 sec
12.4 sec
45 sec.
8.2 sec
29.2 sec
6.0 sec
12.0 sec
IBM Corporation
Notes
*see Figure 10