EQuiPMEnt SElECtion ProCEdurE

LAn090HSV2, LAu090HSV2
LAn120HSV2, LAu120HSV2
Cooling / heating Correction Factors
For the Art Cool Mirror system, calculate the equivalent length of the liquid line from the outdoor unit to the indoor unit. Also, determine the
elevation difference of the indoor unit above or below the outdoor unit. Find corresponding cooling or heating capacity correction factors as
shown in Figure 7 throuigh Figure 10. Multiply the correction factors by the cooling or heating capacity obtained from the capacity table using
design conditions. The resultant is the nET cooling or heating capacity. Consult Table 7, for equivalents lengths regarding elbow connectors.
capacity coefficient Factors
Figure 7: Cooling Capacity Coefficient Factor
Cooling
Figure 8: Heating Capacity Coefficient Factor
Heating
38 | APPLICATIon GuIdeLIneS
100
95
90
24.6
Total Pipe Length (ft)
100
95
24.6
Total Pipe Length (ft)
Due to our policy of continuous product innovation, some specifications may change without notification.
9k,12k
65.6
9k,12k
65.6
98.4
98.4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents