SECTION 5
MAINTENANCE
& LUBRICATION
Stopping for Maintenance
WARNING
The following procedures should be followed when stopping the compressor for
maintenance
or service:
Step
1)
Per O. S.H.A.
regulation
1910.147:
The Control
of Hazardous
Energy Source (Lockout/Tagout),
disconnect and lockout the main
power source. Display a sign in clear view at the main power switch
stating that the compressor
is being serviced.
!
Never assume a compressor
is safe to work on just because
it is not
operating.
It could restart at any time.
Step 2)
Step 3)
Step 4)
Step 5)
Step 6)
Isolate the compressor
from the compressed
air supply by closing
a manual shutoff valve upstream and downstream
from the com-
pressor.
Display a sign in clear view at the shutoff valve stating
that the compressor
is being serviced.
Lock open a pressure relief valve within the pressurized
system to
allow the system to be completely de-pressurized.
NEVER remove
a plug to relieve the pressure!
Shut off the water cooling supply (watercooled
versions).
Open all manual drain valves within the area to be serviced.
Wait for the unit to cool before starting to service. (Temperatures
of 125°F can burn skin. Some surface temperatures
exceed 350°F
when the compressor
is operating.)
Maintenance
Schedule
To assure maximum performance
and service life of your compressor,
a routine
maintenance
schedule
should be developed.
A sample
schedule
has been
included here to help you to develop a maintenance
schedule designed for your
particular
application.
Time frames may need to be shortened
in harsher
environments.
The envelope
shipped
with the compressor
contains
a Maintenance
Schedule Checklist.
Make copies of this checklist and retain the master to
make more copies as needed. On a copy of the checklist, enter dates and initials
in the appropriate
spaces.
Keep the checklist
and this Instruction
Manual
readily available near the compressor.
Maintenance
Schedule
Checklist Sample
Every 8 Hours (or Daily)
Maint ain oil level between high and low level marks on bayonet gauge.
(Discoloration
or a higher oil level reading may indicate the presence
of condensed liquids. ) If oil is contaminated,
drain and replace.
Drain receiver tank, drop legs and traps in air distribution
system.
QR-25 Series
QUINCY COMPRESSOR
52201-104
18