2. Verify the Switch Passes Self Test

Before mounting the switch in its network location, you should first
check that it is working properly by plugging it into a power source
and verifying that it passes its self test.
1.
Connect the adapter's power cord to the power connector on the
back of the switch, and then plug the AC power adapter into a
nearby properly grounded electrical outlet. If the power adapter
part number 5188-6700 is used; first plug the country specific
power cord into the adapter, and then into the AC power source.
Note
The switch does not have a power switch. It is powered on
when the AC power adapter is connected to the switch and
to a power source.
Caution
Use only the AC power adapter and power cord
(if applicable), supplied with the switch. Use of other
adapters or power cords, including those that came with
other ProCurve Networking products, may result in
damage to the equipment.