FREEZE SEQUENCE

3.
Pre chill
The water inlet valve energizes and the compressor
lowers the temperature of the evaporator(s) before the
water pump(s) is energized. The water fill valve will
remain energized until water completes the water level
probe circuit.
4.
Freeze
The water pump(s) energizes and water flows over the
evaporator. After water contacts the water level probe
the water fill valve de-energizes. The control board will
automatically cycle the water fill valve on and off as
needed during the first six minutes of the freeze cycle.
The freeze cycle continues until the six minute freeze
lock expires and enough ice has formed to send a
signal from the ice thickness probe to the control
board.
124
Part Number Preliminary 6/11