Masonry Chimneys; Checklist Summary; Hecklist Ummary - Amana GUI Installation Instructions Manual

Gas-fired warm air furnace
Table of Contents

Advertisement

To rotate the induced draft blower counterclockwise proceed as fol-
lows:
1. Disconnect electrical power from furnace.
T
O AVOID PERSONAL INJURY OR DEATH DUE TO ELECTRIC SHOCK,
DISCONNECT ELECTRICAL POWER BEFORE PERFORMING ANY SERVICE OR
MAINTENANCE.
2. Remove the round cutout from the side of the furnace.
NOTE: The assembly, starting from the outside, is induced draft
blower, outer gasket, rotation plate, inner gasket, partition panel
(See Figure 5).
Figure 5 - Blower Assembly
3. Remove and save the four screws which hold the rotation
plate on the partition panel. Note that one of the screws
which hold the induced draft blower on the rotation plate
needs to be removed.
4. Turn the rotation plate 90 degrees counterclockwise. The
inner gasket must turn with the rotation plate.
5. Reinstall the rotation plate on the partition panel, using the
four screws removed in step 3. Tighten screws to provide
an airtight seal.
6. Make sure all wires are at least one inch from flue pipe.
Relocate junction box to right side of cabinet if necessary.
Refer to Section VIII, Electrical Connections for instructions.
T
O PREVENT SERIOUS ILLNESS OR DEATH TO BUILDING OCCUPANTS DUE TO
FLUE PRODUCTS LEAKING INTO THE BUILDING, PROPER INSTALLATION OF
GASKETS AND SCREWS IS ESSENTIAL FOR PROVIDING A GAS TIGHT SEAL
BETWEEN THE PARTITION PANEL AND THE INDUCED DRAFT BLOWER.
WARNING
WARNING
VII. MA
VII. MA
VII. MASO
VII. MA
VII. MA
P
OSSIBILITY OF PROPERTY DAMAGE, PERSONAL INJURY OR DEATH
DAMAGING CONDENSATION CAN OCCUR INSIDE MASONRY CHIMNEYS WHEN A
C
SINGLE FAN ASSISTED
VENTED WITHOUT ADEQUATE DILUTION AIR.
FURNACE TO A MASONRY CHIMNEY UNLESS THE FURNACE IS COMMON VENTED
WITH A DRAFT HOOD EQUIPPED APPLIANCE OR THE CHIMNEY IS LINED WITH A
T
B
METAL LINER OR
YPE
CHIMNEYS MUST BE SIZED IN ACCORDANCE WITH THE APPROPRIATE VENTING
I
TABLES.
F AN 80% FURNACE IS COMMON VENTED WITH A DRAFT HOOD
EQUIPPED APPLIANCE, THE POTENTIAL FOR CONDENSATION DAMAGE MAY
STILL EXIST WITH EXTREMELY COLD CONDITIONS, LONG VENT CONNECTORS,
EXTERIOR CHIMNEYS, OR ANY COMBINATION OF THESE CONDITIONS.
RISK OF CONDENSATION DAMAGE IS BEST AVOIDED BY USING THE MASONRY
CHIMNEY AS A PATHWAY FOR PROPERLY SIZED METAL LINER OR
METAL VENT.
Crown
Clay Tile Size Generally
12" x 12" (24" Length)
Throat
Damper
Breech
Clean Out
Figure 6 - Typical Multiple Flue Clay Tile Chimney
C
S
HECKLIST
UMMARY
This checklist serves as a summary of the items to be checked
before venting an 80+ furnace into a masonry chimney. In addi-
tion, we recommend that a qualified serviceman use this check-
list to perform a yearly inspection of the furnace venting system.
This checklist is only a summary. For detailed information on each
of the procedures mentioned, see the paragraph referenced with
each item.
This inspection is based upon a draft topical report, "Masonry Chim-
ney Inspection and Relining", issued by the Gas Research Insti-
tute. While not yet finalized, we believe this report represents the
best information on this subject which is currently available.
12
SONR
SO
SO
SO
NRY CHIMNE
NR
NR
NR
Y CHIMNE
Y CHIMNE
Y CHIMNE
Y CHIMNEYS
YS
YS
YS
YS
WARNING
I
AFUE
ATEGORY
APPLIANCE (80%
D
O NOT CONNECT AN 80%
A
METAL VENT.
LL INSTALLATIONS USING MASONRY
Wash
Roof Line
Clay Tile Size: 8" x 8" x12"
(Each x 24" Length)
Attic Floor
1/2" to 1" Air Space
Second Floor
First Floor
F.A.F. Vent
Connector
Natural Draft
Fan Assisted
Water Heater
Forced Air
Furnace
FURNACE) IS
T
HE
T
B
YPE
Water Heater
Vent Connector
Basement Floor

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

GciGui seriesGci series

Table of Contents