PRODUCT DESIGN
When resizing any portion of the common venting system,
use the appropriate table in Appendix G in the latest edition
of the National Fuel Gas Code NFPA 54/ANSI Z223.1.
Upflow or Horizontal units are shipped with the induced
draft blower discharging from the top of the furnace ("Top" is
as viewed for an upflow installation). The induced draft blower
can be rotated 90 degrees for Category I venting. Refer to
the following figure. For horizontal installations, a four inch
single wall pipe can be used to extend the induced draft
blower outlet 1/2" beyond the furnace cabinet. Vent the fur-
nace in accordance with the National Fuel Gas Code NFPA
54/ANSI Z223.1 - latest edition. In Canada, vent the furnace
in accordance with the National Standard of Canada, CAN/
CGA B149.1 and CAN/CGA B149.2 - latest editions and
amendments.
T
O PREVENT DEATH OR SERIOUS ILLNESS TO BUILDING OCCUPANTS DUE
TO FLUE PRODUCTS LEAKING INTO THE BUILDING, PROPER INSTALLATION OF
GASKETS AND SCREWS IS ESSENTIAL FOR PROVIDING A GAS TIGHT SEAL
BETWEEN THE PARTITION PANEL AND THE INDUCED DRAFT BLOWER.
Make sure all wires are at least one inch from flue pipe.
Relocate junction box to right side of cabinet if necessary.
Refer to Electrical Connections section of this manual for
instructions.

Masonry Chimneys

30
WARNING
Crown
Clay Tile Size Generally
12" x 12" (24" Length)
Throat
Damper
Breech
Clean Out
Typical Multiple Flue Clay Tile Chimney
Checklist Summary
This checklist serves as a summary of the items to be
checked before venting an 80% furnace into a masonry chim-
ney. In addition, we recommend that a qualified serviceman
use this checklist to perform a yearly inspection of the fur-
nace venting system.
This checklist is only a summary. For detailed information
on each of the procedures mentioned, see the paragraph
referenced with each item.
This inspection is based upon a draft topical report, "Ma-
sonry Chimney Inspection and Relining", issued by the Gas
Research Institute. While not yet finalized, we believe this
report represents the best information on this subject which
is currently available.
Wash
Roof Line
Clay Tile Size: 8" x 8" x12"
(Each x 24" Length)
Attic Floor
1/2" to 1" Air Space
Second Floor
First Floor
Water Heater
F.A.F. Vent
Vent Connector
Connector
Natural Draft
Fan Assisted
Water Heater
Forced Air
Furnace
Basement Floor

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vds8Ams8Gds8Adss8Vms8

Table of Contents