Heat & Glo SL-550TR-E Owner's Manual page 17

Fireplaces
Hide thumbs Also See for SL-550TR-E:
Table of Contents

Advertisement

V
Minimum
1
SL-550TR-E
90 Elbow
2 ft.
610 mm
1/2 ft.
152 mm
6 ft.
1.8 m
1-1/2 ft. 457 mm 10 ft.
3.0 m
2-1/2 ft. 762 mm 12 ft.
3.7 m
3-1/2 ft.
1.1 m
14 ft.
4.3 m
H
+ H
MAX. =14 FT (4.6 m)
1
2
V
+ V
+ H
+ H
1
2
1
Fire Risk.
• When using SL-HRC-SS and SL-HRC-ZC-SS
termination caps on top vented fi replaces, a one
foot minimum vertical vent section is required
before installing fi rst elbow.
Figure 5.6
Top Vent - Horizontal Termination
Venting with 3 elbows
H
+ H
Maximum
1
2
SL-750TR-E
SL-950TR-E
2 ft.
610 mm
2 ft.
610 mm
6 ft.
1.8 m
6 ft.
10 ft.
3.0 m
10 ft.
12 ft.
3.7 m
12 ft.
14 ft.
4.3 m
14 ft.
MAX. = 40 FT (12.2 m)
2
H
2
WARNING
Heat & Glo • SL-550 / 750 / 950TR-E • 2118-900 Rev. D • 6/07
Note: Use SL D- Series
components only.
1.8 m
Note: There MUST be a 25%
reduction in total H when using
3.0 m
fl ex vent except when using the
3.7 m
simple up and out installation
4.3 m
(see Figure 5.3).
V
2
H
1
V
1
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents