Heat & Glo SL-550TR-E Owner's Manual page 16

Fireplaces
Hide thumbs Also See for SL-550TR-E:
Table of Contents

Advertisement

V Minimum
SL-550TR-E
90 Elbow
1/2 ft. 152 mm 1/2 ft. 152 mm
1/2 ft.
152 mm
1 ft.
305 mm
1-1/2 ft.
457 mm
2 ft.
610 mm
2-1/2 ft.
762 mm
4 ft.
1.2 m
3-1/2 ft.
1.1 m
6 ft.
1.8 m
4-1/2 ft.
1.4 m
14 ft.
4.3 m
H + H
MAX. =14 FT (4.3 m)
1
V + H + H
MAX. = 40 FT (12.2 m)
1
H
Fire Risk.
• When using SL-HRC-SS and SL-HRC-ZC-SS
termination caps on top vented fi replaces, a one
foot minimum vertical vent section is required
before installing fi rst elbow.
Figure 5.5
16
Top Vent - Horizontal Termination
Venting with 2 elbows
H
+ H
Maximum
1
2
SL-750TR-E
SL-950TR-E
0 ft.
1 ft.
305 mm
1 ft.
305 mm
2 ft.
610 mm
2 ft.
610 mm
4 ft.
1.2 m
4 ft.
6 ft.
1.8 m
6 ft.
14 ft.
4.3 m
14 ft.
2
WARNING
Heat & Glo • SL-550 / 750 / 950TR-E • 2118-900 Rev. D • 6/07
Note: Use SL D- Series
components only.
0 mm
Note: There MUST be a 25%
reduction in total H when using
fl ex vent except when using the
1.2 m
simple up and out installation
1.8 m
(see Figure 5.3).
4.3 m
H
1
V
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents