Market Forge Industries Premier PS-3E Owner's Manual page 27

Premier series electric countertop convection steamer installation, operation, maintenance and parts
Hide thumbs Also See for Premier PS-3E:
Table of Contents

Advertisement

7.0 SERVICE (Continued)
UNIT SHUTS DOWN WHILE IN OPERATION
2
Pressure switch has been activated due to 5 PSI (35 kg/cm
) pressure in the generator tank.
Pressure in the generator tank is caused due to plugged steam jet tubes or steam diverters due
to scale or poor water conditions. Steam jet tubes/steam diverter will have to be cleaned or
replaced.
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Premier ps-6e

Table of Contents