MAINTENANCE DATE
Step (standard features)
Clean battery charger
Check all electrical
connections and wiring
Check ac input voltage
Check dc output
voltage
Check ripple voltage
Exercise front panel
controls
Check voltage settings
Final checks
Step (optional features)
Check alarm settings
Combined Alarm Status
Monitor (CASM)
Check integrity of
remote wiring
Step (10-year repair)
Replace capacitors
• All vents clean and open.
• Remove dust and debris from inside of unit.
• TB1 and TB2 connections all tight.
• Internal wiring connections tight, slip-on connectors fully seated. Wire
and lug insulation in good condition.
• Terminations at battery or bus are tight and corrosion free.
• Measure at TB1-L1, TB1-L2 & TB1-L3 (3 Phase only) using ac
voltmeter. Value must be within +10%, -12% of nominal.
• Measure at TB2(+) and TB2(-) using dc voltmeter. Value should agree
with front panel voltmeter within 2%, and must be correct values for
your battery. If the charger is using a temperature compensation probe,
see the curve in Section VII of user's manual to determine correct
battery voltage.
• Measure at battery terminals using ac voltmeter set to milliVolts scale.
• Check against specification listed on charger's Data Nameplate.
• Switch from Float to Equalize, then back to Float.
• Verify front panel meters functional
• Verify adjustment capabilities of float and equalize potentiometers.
• Verify voltage setting per battery manufacturer recommendations.
• Utilize float and equalize potentiometers to make any required
adjustments. See Section IV of user's manual.
• Close and latch front panel door.
• Restore charger to normal operation.
• See Section V of SCR/SCRF Series battery charger user's manual for
calibration of alarms.
• See service instruction JD0036-00 for CASM alarm adjustments
• Test integrity of LEDs by pressing "lamp test" button on front panel.
• Internal temperature compensation network wiring. See instruction
JA5022-00 and Section VII of user's manual.
• Temperature compensation remote probe. See instruction JA5022-00
and Section VII of user's manual.
• See supplied Parts Data Package report or standard replacement parts
table for battery charger manufacturer's part number of optional dc
filtering electrolytic capacitors (C1/C2).
• Order and replace capacitors
SCR/SCRF Series Battery Charger
Preventive Maintenance Procedure
PERFORMED BY
Instructions
Instructions
Instructions
Results
¨ OK
¨ OK
¨ OK
¨ OK
¨ OK
Input
Vac
Float
Vdc
Equalize
Vdc
Ripple
mVac
¨ OK
¨ Volts OK
¨ Amps OK
¨ Float OK
¨ Equalize OK
¨ Float OK
¨ Equalize OK
¨ OK
¨ OK
Results
¨ HVDC OK
¨ LVDC OK
¨ OK
¨ OK
¨ OK
Results