Huffy 21168202 Owner's Manual page 10

Inground system
Table of Contents

Advertisement

Fill hole completely with concrete.
6.
IMPORTANT!:
DO NOT WAIT FOR CONCRETE TO CURE.
Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions
7.
several times while concrete is curing.
1" (2.54 cm)
IMPORTANT!:
GOING ON TO NEXT STEP. CONCRETE MUST CURE.
P/N 21168202 10/04
CONTINUE ON TO NEXT STEP.
NOTE A:
Make a reference mark
here for anti-skid tape.
NOTE B:
Keep flange pushed down
to concrete and leveled.
WAIT A MINIMUM OF 24 HOURS BEFORE
10
3
5
4
1" (2.54 cm)
SIDE VIEW
1" (2.54 cm)
DRAINAGE HILL
PLAYING SURFACE

Advertisement

Table of Contents
loading

Table of Contents