Full Backup; Incr1 Backup And Automated Media Copying - HP B6960-96035 Concepts Manual

Hp projector user manual
Table of Contents

Advertisement

Figure 101 Incr1 backup and automated media copying

Full backup

Configuring backups
You schedule your weekly full backup on Friday at 6 PM. The data protection is set
to 8 weeks. You have 3000 GB of data to back up. The data is divided among
backup specifications in the following way:
BackupSpec1 (Drive 1) - 1000 GB
BackupSpec2 (Drive 2) - 1000 GB
BackupSpec3 (Drive 3) - 500 GB
BackupSpec4 (Drive 4) - 500 GB
BackupSpec1 and BackupSpec2 require 7 media each, BackupSpec3 and
BackupSpec4 require 4 media each. The backup is completed in approximately 14
hours.
Configuring automated media copying
Automated media copying of each backup starts after the backup is completed. You
have 22 media to copy, and all the devices are used as soon as they are available.
Concepts guide
335

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Data protector a.06.10

Table of Contents