When To Schedule Backups; Staggering Full Backups; Optimizing For Restore; The Staggered Approach - HP B6960-96035 Concepts Manual

Hp projector user manual
Table of Contents

Advertisement

This section combines all these concepts by giving some examples of backup schedules
and some tips for efficient scheduling.

When to schedule backups

Typically, you schedule backups to run during lowest user activity, usually at night.
Full backups take the most time, so schedule them at weekends.
Consider scheduling full backups for different clients (backup specifications) on
different days, as shown in
NOTE:
Data Protector offers reports that show available time slots from a device-usage point of
view. This allows you to pick a time where the devices to use are not likely to be occupied
by serving already existing backups.

Staggering full backups

Performing a full backup of all systems during the same day may cause network load
and time window problems. To avoid these problems, use the staggered approach
for full backups.
Table 8 The staggered approach
system_grp_a
system_grp_b
system_grp_c

Optimizing for restore

The combination of your scheduling policy with full and incremental backups highly
influences the time needed to restore your data. This is illustrated in three examples
in this section.
For a point-in-time restore, you need a full backup plus all the incremental backups
to the desired point in time. Since full and incremental backups are typically not on
the same media, you may need to load different media for the full and each
"Staggering full
backups" on page 107.
Mon
Tue
FULL
Incr1
Incr1
FULL
Incr1
Incr1
Wed
...
Incr1
...
Incr1
...
FULL
...
Concepts guide
107

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Data protector a.06.10

Table of Contents