Powering The Dolphin Homebase Device; Ebase Clamp-On Ferrite Core Installation - Honeywell Dolphin 6100 User Manual

Mobile computer with windows embedded handheld 6.5
Hide thumbs Also See for Dolphin 6100:
Table of Contents

Advertisement

Powering the Dolphin HomeBase Device

The terminal requires 5 volts DC input for communication and battery charging; the power adapter on the
power cable converts the voltage from the power source to 5 volts DC. Only power adapter cables from
Honeywell convert the voltage appropriately.
The same power cable that ships with each terminal can be used to power the base. This cable contains
a plug adapter for each geography (US, UK, EU, etc.).
1. Attach the appropriate plug adapter to the power adapter.
2. Plug the power cable into the power source.
3. Plug the connector into the DC power jack on the back panel. The base is now powered.
When a terminal is properly seated, the base powers the terminal, charges the terminal's main battery
pack, and launches ActiveSync (see
page 8-9).
Honeywell recommends that you leave the base connected to its power source at all times, so that it is
always ready to use.

eBase Clamp-on Ferrite Core Installation

We recommend that you install the clamp-on ferrite core included with your Dolphin® eBase on your
Ethernet cable. Installation of the ferrite is required to meet the declared FCC emission levels.
10 - 4
Connecting and Synchronizing the Terminal and Workstation
Plug Adapter
Power Adapter
Power Cable
on

Advertisement

Table of Contents
loading

Table of Contents