Power On; Initialization - TP-Link TL-SL1351 Installation Manual

Gigabit uplink unmanaged switch
Hide thumbs Also See for TL-SL1351:
Table of Contents

Advertisement

Gigabit Uplink Unmanaged Switch

414 Power On

Plug in the female connector of the provided power cord into the power socket of the
device, and the male connector into a power outlet as the following figure shown.
Note: The figure is to illustrate the application and principle. The power plug you get
from the package and the socket in your situation will comply with the regulation in
your country, so they may differ from the figure above.

415 Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests run
automatically to ensure the device functions properly. During this time, its LED indica-
tors will respond as follows:
16
Connection
Figure 4-3 Connecting to Power Supply
For TL-SL1226, the Power LED indicator will light up first and remain ON. After
about three seconds, all port LED indicators will light up for three seconds and then
go off. This process indicates that the device is successfully initialized.
For TL-SL1351, the PWR LED indicator will light up first and remain ON. Other LED
indicators will light up for one second and then go off. This process indicates that
the device is successfully initialized.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tl-sl1226

Table of Contents