7) Settings from the GX-Developer
Set up the Gateway Unit using the network parameters and write the parameters to the PLC.
8) Confirming Operation
• Confirming CC-Link Network Communications
Check the communications status using the
indicators and displays on the CC-Link Master Unit
and Gateway Unit.
• Confirming Participation of CompoNet Slave Units
Check the Participation Flags.
If the registration table is being used, also check
the Registration Table Verification Error Flag.
9) Operation
CompoNet Gateway Unit for CC-Link Operation Manual
▼
▼
Wiring and Settings
---
Refer to 3-7-2.
---Refer to 2-2-2.
---Refer to 4-1-2.
---Refer to 4-1-3.
---Refer to 4-1-3.
3
3 - 2