Download Print this page

GE PNSF39Z01 Owner's Manual page 11

Profile performance series water softening system

Advertisement

Normal Operation, Timer Displays
During normal operation, the present time of day and AM or
PM shows in the time display area
computer determines a regeneration is needed, RECHARGE
TONIGHT begins to flash in the display, along with the present time.
RECHARGE TONIGHT
start time, then changes to RECHARGE NOW, which flashes until the
regeneration is over. The display also shows the current cycle in the
regeneration process. When the valve is in transition between
cycles, both indicators flash.
Feature: Optional Recharge Controls
Sometimes, a manually started regeneration (recharge) may be
desired or needed.
Use one of the following features to start a regeneration
immediately or at the next preset regeneration start time.
RECHARGE NOW
Press and hold the TOUCH or HOLD button until RECHARGE NOW
starts to flash in the time display area. The water softening system
begins an immediate regeneration and, when over in about two
RECHARGE TONIGHT
TOUCH
or
RECHARGE NOW
HOLD
hours, you will have a new supply of soft water. Once started, you
cannot cancel this regeneration.
RECHARGE TONIGHT
Touch (do not hold) the TOUCH or HOLD button. RECHARGE
TONIGHT flashes in the time display area. A regeneration will occur
at the next preset regeneration start time. If you decide to cancel
this regeneration, touch the same button once more.
Two examples:
You have used more water than usual (house guests, extra
washing, etc.) and you may run out of soft water before the next
regeneration.
You did not refill the storage tank with salt.
. When the demand
PM
flashes until the next regeneration
PM
RECHARGE TONIGHT
11

Hide quick links:

Advertisement

loading