3.1 Projector Web Control
3.1.7 Schedule Settings
1) Schedule Management
Item
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Specific date No.1
Specific date No.2
Specific date No.3
Specific date No.4
Specific date No.5
DWU951/DWX951/DXG1051 User's Manual - Network Guide
Displays and configures schedule settings.
NOTE
before enabling scheduled events. (
Date/Time Settings)
• Refer to 8.3 Event Scheduling for the details
of schedule settings. (
Schedule settings executed on each day of the week.
Schedule settings executed on specified day. Up to 5 days
can be specified.
49
• Be sure to set the date and time
92)
&
Description
3. Web Control
3.1.8
&
020-000662-01 Rev. 1 (01-2014)