Schedule Power On/Off - Thecus N2800 User Manual

Ip storage server
Hide thumbs Also See for N2800:
Table of Contents

Advertisement

1. Use the Browse button
2. Press Apply.
3. The beeper beeps and the Busy LED blinks until the upgrade is complete.
NOTE
WARNING

Schedule Power On/Off

Using the Thecus IP storage System Management, you can save energy and money
by scheduling the Thecus IP storage to turn itself on and off during certain times of
the day.
From the menu, choose the Schedule Power On/Off item and the Schedule
Power On/Off screen appears.
To designate a schedule for the Thecus IP storage to turn on and off, first enable the
feature by checking the Enable Schedule Power On/Off checkbox.
Then, simply choose an on and off time for each day of the week that you would like
to designate a schedule by using the various dropdowns.
Finally, click Apply to save your changes.
Example - Monday: On: 8:00; Off: 16:00
System will turn on at 8:00 AM on Monday, and off at 16:00 on Monday. System will
turn on for the rest of the week.
If you choose an on time, but do not assign an off time, the system will turn on and
remain on until a scheduled off time is reached, or if the unit is shutdown manually.
Example - Monday: On: 8:00
to find the firmware file.
• The beeper only beeps if it is enabled in the System Notification menu.
• Check Thecus website for the latest firmware release and release notes.
• Downgrading firmware is not permitted.
Do not turns off the system during the firmware upgrade process.
This will lead to a catastrophic result that may render the system inoperable.
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

N4800

Table of Contents