Tiger SIDE FLAIL JD 5065M-105M CAB Operating Instructions Manual page 39

Side flail assemblies
Table of Contents

Advertisement

ASSEMBLY
HOSE AND WIRE ROUTING
Attach two clamps to the right rear wheel well for proper hose/wire routing. Drill
one hole for each clamp. Use the lower rear corner of the wheel well as an origin for
measuring. The holes should be 10mm or 3/8" reamed to accept 3/8" hardware.
Measure along the back edge of the wheel well 6" from the origin. Use a square to
measure 2-½" up, from the last mark. Refer to the image below to see the first hole.
The second hole should run parallel to the bottom edge of the wheel well. Mark
the hole 22" from the origin and 3-½" from the bottom edge. Use the images below
for reference.
NOTE: DO NOT CUT INTO TUBES / HOSES / WIRES WHEN DRILLING
THROUGH METAL OR PLASTIC!.
(ASM-JD-0068)
Place as many hoses in the clamp that will fit without compromising pressure. Then
secure the (2) HOSE CLAMP (06520013) to the holes drilled with (1 EACH)
CAPSCREW,3/8 X 1 NC (21630) and (1 EACH) NYLOCK NUT,3/8 NC (21627). The
hoses that don't fit into the clamp are to be secured to the others with zip-ties. For
protection of hoses in contact with metal edges, wrap hoses with spit hose sections
and fasten with hose clamps or zip ties as needed.
Assembly Section 2-13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jd 5065mJd 5085m-105m cab

Table of Contents