Tiger SIDE FLAIL JD 5065M-105M CAB Operating Instructions Manual page 32

Side flail assemblies
Table of Contents

Advertisement

CABLE CONTROL LEVER STAND
Place the cable control bracket on the floor so that the bracket is 2-1/2" from the side
edge of the door, and 4-3/8" in front of the rear edge of the door. See images below. Be
sure that the location of the stand will allow the operation of all control levers in the tractor
and that the door will not strike the stand when shut. Before drilling double check location
of the stand for proper placement of holes. Make sure that all cables and wires are clear
of the area before drilling holes to mount the stand. Drill 3 holes to match control bracket
as shown below and secure with capscrews and nylock nuts noted in parts section..
The rubber boot under the rear window can be cut in a cross hair pattern and if
necessary the bottom cut through to allow it to slip over the cables and back into position.
These cables will be routed to the lift valve mounted on the valve mounting plate, and
should not have any sharp bends or kinks in them. Secure cables with zip ties and apply
RTV sealer in and around individual cables, inside and outside of the cab for a water tight
seal. Do not allow excess cable to hang unsecured on the outside of the cab.
.
0087)
ASSEMBLY
Assembly Section 2-6
(ASM-JD-

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jd 5065mJd 5085m-105m cab

Table of Contents