Powering On The Switch - Accton Technology CheetahSwitch Workgroup-3726M Quick Installation Manual

Table of Contents

Advertisement

Quick Installation Guide
1000BASE-SX and 1000BASE-LX fiber optic cable depends on the core size and
the rating of the cable, as shown in the following tables.
Fiber Size
62.5/125 micron
multimode fiber
50/125 micron
multimode fiber
Fiber Size
9/125 micron
singlemode fiber

Powering On the Switch

1.
Plug the power cord into the power socket on the rear of the switch, and the
other end into a power outlet. (If you have purchased a redundant power
supply, plug it into the "DC INPUT" receptacle on the rear of the switch.)
2.
Check the LED marked Power on the front panel to see if it is on. The unit will
automatically select the setting that matches the connected input voltage.
Therefore, no additional adjustments are necessary when connecting it to any
input voltage within the range marked on the rear panel.
3.
The switch performs a self-diagnostic test upon power-on. (Note that this test
takes several minutes to complete.)
Note: The unit supports a "hot remove" feature which permits you to connect or
disconnect twisted-pair or fiber cables without powering off the switch and without
disrupting the operation of the devices attached to the switch.
8
Maximum 1000BASE-SX Gigabit Ethernet Cable Length
Fiber Bandwidth
160 MHz/km
200 MHz/km
400 MHz/km
500 MHz/km
Maximum 1000BASE-LX Gigabit Ethernet Cable Length
Fiber Bandwidth
N/A
Maximum Cable Length
2-220 m (7-722 ft)
2-275 m (7-902 ft)
2-500 m (7-1641 ft)
2-550 m (7-1805 ft)
Maximum Cable Length
2 m - 5 km (7 - 16404 ft)

Advertisement

Table of Contents
loading

Table of Contents