3. Match the punch marks of the power arm and lift shaft for assembly.
4. Match the punch marks of the lift arm and lift shaft for assembly.
5. Wrap the seal tape around the breather and mount it with the hole forward.
6. Apply some liquid packing (ThreeBond #1208D) to the mounting face of the lift case for assembly.
Torque: 39.2 to 44.1N•m {400 to 450kgf•m, 28.9 to 36.2lbf•ft}
7. Refer to the table for torque for each part. (Standard torque unless specified.)
K&T Saw Shop 606-678-9623 or 606-561-4983
www.mymowerparts.com
Hydraulic System
Bush slit (R&L)
M
S
-P
O
2
Packing
M
S
O
2
Breather
25
A
Lock screw
Match the punch marks of the power arm
and lift shaft for assembly.
Lock screw
A
-P
Bush slit
1
GZ3W31-026C