Placing Into Operation; Equipment As Fitted; Initial Checklist - Honeywell NOTIFIER IFS-2600 Technical Installation Manual

Fire indicator panel
Table of Contents

Advertisement

IFS-2600 Installation & Programming Manual
Suitably qualified technicians must install the panel. The following check procedures are recommended after
every installation and prior to initial power-up.
A thorough visual inspection should be made to every aspect of the fire panel. This includes loose wire, metal
filings, loose circuit boards, loose cabling, damage in transit etc.
All problems must be rectified immediately as they could cause incorrect operation or permanent damage to
the equipment.

EQUIPMENT AS FITTED

QTY
Description
1
MAIN CONTROL BOARD
1
MAIN TERMINATION BOARD
1
MAIN POWER SUPPLY
8 ZONE EXPANSION BOARD
16 ZONE INDICATOR BOARD
ADD ON, 8 WAY RELAY BOARD
EXTERNAL POWER SUPPLY BOOSTER
3A DOOR HOLDER P/SUPPLY TRANSFORMER

INITIAL CHECKLIST

System general appearance good
Cabinet colour and condition good
Cabinet keyed 003
All circuit boards firmly fastened
Manual call point fitted & functional
Viewing window clear and firmly secured
Cable entries adequately sealed
240VAC mains cabling is correctly terminated
All earthing secured
Transformer securely mounted
Transformer correctly wired
All ribbon cables firmly secured
All operational zones adequately identified
All fuses correct value and fitted properly
All other modules securely fitted
Manufacturing label affixed
You are now ready to power up the IFS-2600 Fire Indicator Panel.
P/N 10069 ECN08-0066

PLACING INTO OPERATION

Code
IFS -2004
IFS -2005
IFS -2006
IFS -804
IFS -816
IFS-717
PS244, PS249, NPS-3,
NPS-5, NPS-11
2600/DHTX
Page 17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents