Emerson Copeland Scroll Installation And Reference Manual page 37

Outdoor condensing unit
Hide thumbs Also See for Copeland Scroll:
Table of Contents

Advertisement

technical bulletin
Add and Connect XJ Scroll
To enable communications between E2 and the XJ Scroll, the devices must be added and addressed in E2.
1. Log in to the E2 with Level 4 access.
I
2. Press
3. In the Connected I/O screen, under the ECT tab, Enter the number of XJ Scroll devices in the XJ Scroll Unit
number field.
J
4. Press
to return to the Network Setup menu, then select
5. Locate the XJ Scroll units you added to the network list (press
default name for an XJ Scroll begins with a two-letter designator of the model type (XJ for XJ Scroll).
Document Part # 026-4909 Rev 0 11-NOV-2010
©2010 Emerson Climate Technologies Retail Solutions, Inc. This document may be photocopied for personal use.
Visit our website at http://www.emersonretailsolutions.com/ for the latest technical documentation and updates.
Installation Instructions: XJ Scroll Condenser to E2
- Connected I/O Boards and Controllers.
Figure 6 - Connected I/O Screen
Figure 7 - Network Summary Screen
- Network Summary.
8
7
and
to scroll through the list). The
Page 9 of 12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xjam-002Xjal-002Xjam-012Xjal-012Xjam-022Xjal-022

Table of Contents