LOADING
As bucket begins to fill with material, gradually
roll the bucket back and raise the loader to
increase "fill" capacity. This procedure also
results in the material being removed in layers
from the top for maximum loading efficiency.
When th le bucket is full, rais e loade
of
the bucket is clear
material and slowly back
out
of
pile.
For maximum loading efficiency, minimize
of
angle
turn and distance between the
loading and unloading points.
OPERATING INSTRUCTIONS
29