3) Periodic Maintenance and Check List
When overhauling, refer to the following table.
Maintenance checks
Cleaning of tape path
Tape
path
Cleaning and degaussing of drum ass'y
system
Capstan Shaft
D
S
R
Gear Capstan
Y
I
S
Gear Pully Shaft
V
T
I
Belt Timing
E
N
M
Motor Loading
G
Perform-
Abnormal Noise
ance
Back Tension
Confir-
Brake System
mation
PB, REV Torque Measurement
◆ When lubrication bearings, be sure to keep the oil
free of dust. (Oil contaminated with dust might
cause the bearings to wear out or seize.)
◆ A "drop"of oil is defined as the amount attached to
the tip of a Ø 2mm stick as shown in Fig. 4-4.
Samsung Electronics
<Table 4-2>
Hours of use (H)
500
1000
1500
2000
O
O
O
O
O
O
O
O
∆
∆
∆
∆
∆
∆
◆
◆
◆
◆
◆
◆
◆
◆
◆
◆
◆
◆
◆
O : Cleaning
∆ : COil
2500
3000
3500
4000
O
O
O
O
O
O
O
O
∆
∆
∆
∆
∆
∆
◆
◆
◆
◆
◆
◆
◆
◆
◆
◆
◆
◆
◆
◆
◆ : Confirmation
Alignment and Adjustments
Remark
4500
5000
O
O
O
O
∆
- Never let oil get on to the tape path
∆
surface.
∆
◆
◆
◆
◆
◆
◆
◆
2mm
OIL
Fig. 4-4
4-3