Boiler Set-Up - PEERLESS GM Installation, Operation & Maintenance Manual

Gas boilers series gm
Table of Contents

Advertisement

BOILER SET-UP

2. BOILER SET-UP
1. Provide a sound, level foundation. Locate boiler as
near to the chimney or outside wall as possible and
centralized with respect to the heating system.
2. Locate boiler in front of installation position before
removing crate.
6
3. Separate the wood shipping pallet from the boiler
base by removing two (2) hold-down bolts at each
end of the boiler base.
4. Move boiler into final position.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gm-05Gm-06Gm-07Gm-08

Table of Contents