Advance Planning; Ductwork Planning; Ceiling Framing For Adequate Support - GE ZV855 Installation Instructions Manual

Island vent hood
Hide thumbs Also See for ZV855:
Table of Contents

Advertisement

Available languages

Available languages

Advance Planning
DUCTWORK PLANNING
• The hood is designed to be vented vertically
through the ceiling. Use locally supplied elbows
to vent horizontallg
through the rear wall.
• Determine the exact location of the vent hood.
• Plan the route for venting exhaust to the outdoors.
• Use the shortest and straightest
duct route
possible. For satisfactorg
performance,
duct run
should not exceed 100' equivalent
length for ang
duct configurations.
• Refer to "Duct Fittings" chart to compute the
maximum
permissible length for duct runs to
the outdoors.
• Use rigid metal ductwork onlg.
ThroughThe Ceiling
Flat
..........
Standing
Vent Between
CeilingJoists
• This vent hood must use 6" round duct. The
6" round duct can transition
to 3-1/4" x 10"
or 3-1/4" x 12".
• Install the house duct to run horizontallg
between
ceiling joists or straight
up through
the roof.
• Install a wall or roof cap with damper at the
exterior opening. Order the wall or roof cap
and ang transition
and length of duct needed
in advance.
WA RN ING: TO REDUCE
THE R ISK
OF FIRE, USE ONLY RIGID METAL DUCTWORK.
CEILING FRAMING FOR ADEQUATE
SUPPORT
• These vent hoods are heavg. Adequate structural
support must be provided. The ceiling structure
must be capable of supporting
the weight of the
hood and ang inadvertent
user contact loads
(approximatelg
200 pounds). The hood support
frame will be supported
bg 2 x 4 minimum
cross-
framing.
• Installation
will be easier if the vent hood is
installed before the cooktop or countertop
below
is installed.
Accessory
Duct Cover
A duct cover accessorg
mag be required for gour
installation,
depending
on ceiling height.
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zv850

Table of Contents