Advance Planning; Ductwork Planning; Wall Framing For Adequate Support - GE Monogram ZV750 Installation Instructions Manual

36" vent hood
Hide thumbs Also See for Monogram ZV750:
Table of Contents

Advertisement

Available languages

Available languages

Advance Planning
DUCTWORK PLANNING
• This hood is designed to be vented vertically
through the ceiling. Use locally supplied elbows
to vent horizontally
through the rear wall.
• Determine the exact location of the vent hood.
• Plan the route for venting exhaust to the outdoors.
• Use the shortest and straightest
duct route
possible. For satisfactory
performance,
duct run
should not exceed 100' equivalent
length for any
duct configurations.
• Refer to "Duct Fittings" chart to compute the
maximum
permissible length for duct runs to
the outdoors.
• Use rigid metal ductwork only.
• This vent hood must use a 6" round duct. The
6" round duct can transition
to 3-1/4" x 10"
or 3-1/4" x 12".
• Install the house duct to run horizontally
between
ceiling joists or straight
up through
the roof.
• Install u wall or roof cup with dumper at the
exterior opening. Order the wall or roof cup
and any transition
and length of duct needed
in advance.
^,-, W ARNING: TO REDUCE
T.E RIsK oF FIRE.
USE ONLY RIGID METAL DUCTWORK.
WALL FRAMING FOR ADEQUATE
SUPPORT
• This vent hood is heavy. Adequate
structural
support must be provided. The hood must be
secured to vertical studs in the wall. See page 9
or 14.
We strongly
recommend
that the vent hood with
duct cover be on site before final framing and wall
finishing. This will also help to accurately
locate
the ductwork and electrical service.
• Installation
will be easier if the vent hood is
installed before the cooktop and countertop
are
installed.
ADVANCE PLANNING
A duct cover accessory
may be required for your
hood installation
depending
on ceiling height.
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zv755

Table of Contents