Operation - GE LP33 Series 80 User Manual

Lp33 series 80 & 100kva / 208vac ul / s1
Table of Contents

Advertisement

7

OPERATION

START UP AND COMMISSIONING
A GE GLOBAL SERVICES FIELD ENGINEER must perform start-up and
commissioning of the UPS. Please Contact GE. Global Services at least
two weeks prior to schedule start-up and commissioning at 1-800-637-
1738, or by E-mail at pqservice@ge.com.
This symbol refers to the operations of a Parallel System.
NOTE !
Verify for correct input/output cabling before connecting Utility to the
UPS.
Open only the front door, do not remove any panels.
Check after every step for correct reaction of the UPS (LED's on the
panel), and correct voltage and current measurements, before you
proceed to the next step.
Find on the following pages the descriptions of the various procedures of start-up and
shutdown for single and parallel UPS's, divided into the following principal chapters:
7.1
PROCEDURES FOR SINGLE LP33 Series 80 & 100
7.2
PROCEDURES FOR LP33 Series 80 & 100 PARALLEL SYSTEM
Modifications reserved
OPM_LPS_3UO_80K_M10_1US_V010.doc
Page 41/66
User Manual LP33 Series 80 & 100 UL S1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lp33 100

Table of Contents