Connect any required internal or external cables to the expansion board. See the documentation that
10.
ships with the expansion board.
Install the PCI riser cage (on page 23).
11.
Install the access panel (on page 22).
12.
PCI riser board option
CAUTION:
expansion slot covers, or blanks installed. If the server supports hot-plug components, minimize
the amount of time the access panel is open.
Power down the server (on page 20).
1.
Extend the server from the rack (on page 20).
2.
Remove the access panel (on page 21).
3.
Remove the PCI riser cage (on page 22).
4.
Install the optional riser board.
5.
Install any expansion boards.
6.
Install the PCI riser cage (on page 23).
7.
Install the access panel (on page 22).
8.
Install the server into the rack.
9.
Power up the server (on page 20).
10.
For proper cooling do not operate the server without the access panel, baffles,
("Expansion board
options" on page 48)
Hardware options installation 51