Wall Plenum and Architectural Louver Installation
NOTICE
IMPORTANT REMINDER: FRIEDRICH WALL PLENUM IS NOT DESIGNED TO CARRY
STRUCTURAL LOADS. PROPER WALL HEADER CONSTRUCTION IS REQUIRED. THE PLENUM REQUIRES
PROPER FLASHING, SHIM AND CAULK FOR A WEATHER RESISTANT INSTALLATION.
Figure 5
Wall Plenum & Outdoor Louver Installation
Ensure that the bottom of the plenum is 3/4" from the floor of the closet. Note: 24,000 BTU installation
height may be different. Refer to specific installation manual for clarification.