Step 10.
Slide the batteries into the UPS. Allow enough working space to make the final wiring connections in step
below.
Step 11.
Final connections:
600 & 1000 VA: Connect the Black Wire as shown in diagram above.
1500 & 2000 VA: Connect the Red Wire as shown in diagrams above.
Step 12.
Install Metal Battery cover plate: Install metal plate with Phillips-head screws.
Step 13.
Re-Install Left front cover first by using the Phillips-head screws. Put the Right front cover on the Right side
first; press the left side into the UPS.
Step 14.
Rack Mount Procedure -
Step 1.
Remove front cover panel; pull out from the middle left. (See diagrams below)
Step 2.
Push front cover panel to the right slightly to allow front cover to be moved to the side. (See diagrams below)
Modifications Reserved
OPM_ITS_USM_M06_M20_0US_V011 (09/2007)
Battery replacement complete.