Baxi Ecogen 24/1.0 Installation & Servicing Instructions Manual page 21

Gas fired wall mounted condensing boiler and power generator
Table of Contents

Advertisement

iii) Termination to a drain or gully
Boiler
iv) Termination to a purpose made soakaway
Further specific requirements for soakaway
Boiler
design are referred to in BS 6798.
© Baxi Heating UK Ltd 2012
Pipe must terminate above
water level but below
surrounding surface. Cut
end at 45°
500mm min
Holes in the soak-away must
face away from the building
7.0 Site Requirements
7.8
Condensate Drain (cont.)
11. When discharging condensate into a soil stack or waste
pipe the effects of existing plumbing must be considered. If
soil pipes or waste pipes are subjected to internal pressure
fluctuations when WC's are flushed or sinks emptied then
back-pressure may force water out of the boiler trap and
cause appliance lockout.
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecogen 24/1.0 lpg

Table of Contents