Natural Gas
Baxi Ecogen 24/1.0
G.C.N
41 075 60
o
This appliance contains a pressure vessel filled with Helium to 23 bar.
Do not strike, drop, drill or puncture the vessel.
Do not unbolt any of the covers or flanges.
The vessel contains no user serviceable parts.
Dispose of safely - see section 18.0 for further safety information.
The Benchmark Scheme
Benchmark places responsibilities on both manufacturers and installers. The
purpose is to ensure that customers are provided with the correct equipment for
their needs, that it is installed, commissioned and serviced in accordance with the
manufacturer's instructions by competent persons and that it meets the
requirements of the appropriate Building Regulations. The Benchmark Checklist
can be used to demonstrate compliance with Building Regulations and should be
provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work
in accordance with the Benchmark Code of Practice which is available from the
Heating and Hotwater Industry Council who manage and promote the Scheme.
Visit www.centralheating.co.uk for more information.
© Baxi Heating UK Ltd 2012 All rights reserved. No part of this publication may
be reproduced or transmitted in any form or by any means, or stored in any
retrieval system of any nature (including in any database), in each case whether
electronic, mechanical, recording or otherwise, without the prior written
permission of the copyright owner, except for permitted fair dealing under
Copyrights, Designs and Patents Act 1988.
Applications for the copyright owner's permission to reproduce or make other
use of any part of this publication should be made, giving details of the proposed
use, to the following address:
The Company Secretary, Baxi Heating UK Ltd,
Brooks House, Coventry Road, Warwick. CV34 4LL
Full acknowledgement of author and source must be given.
WARNING: Any person who does any unauthorised act in relation to a
copyright work may be liable to criminal prosecution and civil claims for damages.
0086
2
© Baxi Heating UK Ltd 2012
Propane
Baxi Ecogen 24/1.0 LPG
G.C.N
41 075 64
o
Building Regulations and the Benchmark Commissioning
Checklist
Building Regulations (England & Wales) require notification of
the installation of a heating appliance to the relevant Local
Authority Building Control Department. From 1 April 2005 this
can be achieved via a Competent Persons Self Certification
Scheme as an option to notifying the Local Authority directly.
In England and Wales the electrical installation of an Ecogen
appliance is notifiable under the current Part P building
regulations.
In Scotland the electrical Installation of an Ecogen appliance
requires a building warrant (legal permission from the local
authority to start the work). This building warrant has to be
approved by a registered electrical installer (known formally as
an 'approved certifier') or be checked by the local authority.
In Northern Ireland guidance should be taken from the local
authority or equivalent governing body for all electrical works.
The Health & Safety Executive operates the 'Gas Safe Register',
a self-certification scheme for gas heating appliances.
These arrangements represent a change from the situation
whereby compliance with Building Regulations was accepted as
being demonstrated by completion of the Benchmark Logbook
(which was then left on site with the customer).
With the introduction of Self Certification Schemes, the
Benchmark Logbook is being withdrawn. However, a similar
document in the form of a commissioning checklist and service
interval record is incorporated at the back of these instructions.
This company is a member of the Benchmark initiative and fully
supports the aims of the programme. Its aim is to improve the
standards of installation and commissioning of central heating
systems in the UK and to encourage the regular servicing of all
central heating systems to ensure safety and efficiency.
Building Regulations require that installations should comply
with manufacturer's instructions. It is therefore important that
the commissioning checklist is completed by the installer. The
relevant section of Building Regulations only relates to
dwellings. Therefore the checklist only applies if the appliance is
being installed in a dwelling or some related structure.
The flowchart opposite gives guidance for installers on the
process necessary to ensure compliance with Building
Regulations.
Electrical Regulations
The Distribution Network Operator (DNO) and the Electricity
Provider must be informed of the appliances connection to the
grid.
The DNO notification is achieved by the completion of a
G83/1 connection pro-forma (see Document 5133893
supplied) or entry of the relevant details on the DNO website
if available.