Hardware Installation
3.11. TURBO LED CONNECTOR INSTALLATION
The TURBO LED on panel can indicate the current speed status of system.
The TURBO LED connector should be installed to TD in correct direction.
3.12. HARDWARE RESET SWITCH CONNECTOR INSTALLATION
The RESET switch on panel provides users with HARDWARE RESET
function which is almost the same as power-on/off. The system will do a cold
start after the RESET switch is pushed and released by user. The RESET
switch is a 2 PIN connector and should be installed to RST on mainboard.
3.13. GREEN FUNCTION INSTALLATION
For the purpose of power saving, there are two jumpers, GN and GD, to
make sure that the power saving function is working. The GD is an indicator
(green LED) for green function. If the green LED is ON, the system is
operating in green mode. The GN is a switch to force the system to get into
green mode immediately.
3.14. PERIPHERAL DEVICE INSTALLATION
After installation of the device and setup of the jumpers, the mainboard can
be mounted into the case and fixed by screw. To complete the mainboard
installation, the peripheral devices could be installed now. The basic system
needs a display interface card and a storage device.
If a PCI - Bus device is to be installed in the system, any one of four PCI -
Bus slots can be used for Slave or Master PCI - Bus device.
After installing the peripheral device, the user should check everything again
and prepare to power-on the system.
3.15. KEYBOARD SETTING FUNCTION
After booting the O.S., there are some special functions used by keyboard as
follows:
"CTRL_ALT_DEL"
Pressing these keys simultaneously will cause
system to Warm Start (Software Reset).
3-10