• Keep communications cables away from line voltage wiring, lighting
ballasts, and other devices emitting EMF energy.
• Maintain a minimum of two inches between line voltage wires and
communications or zone controller cables.
• Never use wire caps.
• Never splice communication cables.
• Star and Wye communications cable configurations are not acceptable.
• Never connect the Hydro Kit controller or other central control prod-
ucts such as AC Smart, PDI, or the LG building management system
gateway products to the communications cable between the indoor
unit and outdoor unit.
Communications Cables Between the Water Source or outdoor Unit and the Hydro Kit/Indoor Units/Heat recovery Units
(Heat recovery Systems only)
Refer to the applicable Outdoor or Water Source Unit manuals for cable routing and connection architecture. Figure 29 shows the correct
connection communication cable schematic, including the Hydro Kit among the indoor units. Note Figure 30, which shows improperly termi-
nated communication cable connections in a "starburst" pattern.
Master Outdoor Unit
Hydro Kit
Heat Recovery Unit
for Heat Recovery
Systems Only
Figure 29: Outdoor Unit Communications Labeling Schematic
K2 or K3
IDU
IDU
Hydro Kit Unit Controller
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG Life's Good" is a registered trademark of LG Corp.
The minimum distance required between power wires and the communi-
cations cable is voltage/amperage dependent and in cases where either
are relatively high, the minimum distance may be more than two (2) inch-
es. Refer to the respective LG Multi V Outdoor Unit Engineering Manual
on www.lg-vrf.com for detailed information.
Procedure
1. Terminate all Multi V communications cables within the confines
of the Hydro Kit unit cabinet.
2. When pulling cable between components, leave enough slack
to properly route the cable through the unit keeping it away from
the line voltage wiring.
LG device communications cable voltage does not exceed 5 volts. LG
does not require a handy box to mount the Hydro Kit Unit Controller or
the optional LG Remote Wall Mounted Sensor. Check local code and
install per regulation.
3. Field provides a minimum of 18-2 AWG, stranded and shielded
communications wiring between the indoor units, heat recovery
boxes (if applicable), Hydro Kit, and outdoor units.
4. Ground the shield of the communications cable at the OUTDOOR
UNIT END ONLY.
IDU
IDU
IDU
Indoor Unit Zone Controllers
rouGHING-IN

Communications Cables

37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Arnh763k3b2

Table of Contents